Strip Out Project
This project involved a full strip out of an existing kitchen and selected non-load-bearing walls in a residential property located in Sydney’s Inner West. The aim was to prepare the home for a major renovation that would introduce a modern open-plan layout and a brand-new kitchen installation. The scope included the removal of cabinetry, appliances, wall tiles, flooring, and redundant plumbing and electrical fixtures.
Client:
Category:
Start Date:
End Date:
Budgets:

Despite the confined residential setting, our team executed the strip out safely and efficiently. Noise and dust control measures were implemented to minimize impact on the household and surrounding neighbors. The result was a fully cleared space, structurally sound and ready for the next phase of renovation.
Our Process to Execute This Project
To ensure safety, efficiency, and compliance, we followed a clear process:
Project Results
The strip out was completed on time and within budget, providing the homeowner with a blank canvas for their renovation. Key outcomes included:
- Full kitchen removal completed in 15 days
- Safe dismantling of non-structural walls
- Proper disconnection of plumbing and electrical systems
- 75% of materials recycled or repurposed
- No damage to retained structural elements
- Site handed over clean and ready for renovation works
Project Photo

